Tampa cost guide
Post-construction cleaning in Tampa costs $450 to $1,200, flat.
2,000 sq ft $700 · 3,000 sq ft $950 · about $0.30–$0.45 per sq ft
Priced by finished floor area, fixed in writing after a walkthrough, and the same curve our booking form uses. Here is the table per square foot, and what each cleaning phase involves.
The short answer
A final post-construction clean in Tampa runs $450 to $1,200 by finished square footage. A 2,000 sq ft remodel or new build is $700; a 3,000 sq ft home is $950. Anything up to 1,000 sq ft is the $450 floor, and 4,000 sq ft or more is the $1,200 ceiling.
Per square foot that works out to about $0.45 on a small job and $0.30 on a large one, because setup and the first pass of dust removal cost the same whatever the size.
Post-construction cleaning price per square foot
The flat price for the final clean at each size. A size between rows lands between the prices; the walkthrough sets the exact number.
| Finished floor area | Flat price | Per sq ft |
|---|---|---|
| 1,000 sq ft | $450 | $0.45 |
| 1,500 sq ft | $575 | $0.38 |
| 2,000 sq ft | $700 | $0.35 |
| 2,500 sq ft | $825 | $0.33 |
| 3,000 sq ft | $950 | $0.32 |
| 3,500 sq ft | $1,075 | $0.31 |
| 4,000 sq ft and up | $1,200 | $0.30 |
Rough, final and touch-up: the three cleans on a build
Rough clean
After drywall, paint and the trades, before flooring and fixtures are finished. Debris out, heavy dust off walls and openings, floors swept so the next trade is not working in it. Quoted on the walkthrough, because it depends on how far the job has got.
Final clean
The one the table prices. Multi-pass fine-dust removal from every surface, vent and register, paint, adhesive and sticker removal, interior windows with their tracks and frames, fixtures, hardware and appliances polished, and a final floor finish. This is what turns a site back into a home for the walkthrough or the closing.
Touch-up clean
After the punch list, when trades have been back in to fix the last items. Quoted on the walkthrough along with the final clean.
Quoted on walkthrough. Typically one to two crew-days.
What moves the price, and what it compares with
Square footage sets the number. Condition can move it: heavy overspray, adhesive on glass or a site that still has debris in it is more work, and we say so in the written quote before we start, never on the invoice. Timing matters to you more than to the price: book the final clean after the last trade leaves, or you pay for it twice.
For comparison, a move-out clean of a lived-in empty home runs $280–$650, and a one-time deep clean tops out at $385. Construction dust is finer and settles again after the first pass, which is why this clean is priced above both.
Cleaning an occupied office or a commercial fit-out on a schedule instead? See our commercial cleaning rates. Service details and the areas we cover are on the post-construction cleaning page and cleaning in Tampa.
Post-construction cleaning cost questions
How much does post-construction cleaning cost in Tampa?
$450 to $1,200 flat for the final clean, by finished square footage. A 2,000 sq ft home is $700 and a 3,000 sq ft home is $950. The exact price is set in writing after a walkthrough.
Is post-construction cleaning priced per square foot?
It is a flat price set by square footage, which works out to about $0.30 to $0.45 per sq ft. Smaller jobs cost more per foot because setup and the first dust pass do not shrink with the home.
What is the difference between a rough, final and touch-up clean?
The rough clean clears debris and heavy dust while trades are still working. The final clean is the detailed multi-pass clean before the walkthrough or closing, and it is what our table prices. The touch-up follows the punch list. Rough and touch-up passes are quoted on the walkthrough.
Do you have liability coverage for job-site work?
Our general liability policy is being put in place now, and it will be bound before we take our first job — ask us where it stands when you book and we will tell you straight. Every cleaner is an experienced independent contractor we vet personally and hold to a written service agreement before their first job.
How long does a post-construction clean take?
Quoted on walkthrough. Typically one to two crew-days.